Abseil Window Cleaning Case Study
 

Due to stringent Health & Safety issues surrounding food preparation & production areas, Warburtons were seeking to address an access problem that prevented them from cleaning structural steelwork & plant above the production areas within their bakeries.

Unable to overcome the problems using conventional access equipment Advance Group were tasked with delivering a Safe, Efficient system that would ensure the highest quality results with the least amount of disruption.

The brief was simple. The bakery would be operational 6 days per week, the window of oppportunity would be between the hours of 6am and 2pm 1 day per week. Everything over 2 metres would require cleaning with no exception. At the end of each shift the Bakery would have to be fully operational with no equipment left on site.

 
Back to Case Studies
HasMillikenSafe Contractor ApprovedInstitute of Inspection Cleaning And Restoration Certification
site map privacy policy terms & conditions © 2008 Advance Group